21 July 2016 |
http://www.spacedaily.com/reports/Orbital_ATK_gets_182_million_Missile_Defense_Agency_contract_999.html |
The contract includes production equipment, logistics, associated support equipment, system engineering and analysis and mission operations. Work will be performed in Arizona and has an estimated completion date of October 2020. Since ballistic missiles have different ranges, speeds, size and performance
characteristics, the system is an integrated, layered architecture that provides
multiple opportunities to destroy missiles and their warheads before they reach
their targets. |
|